Land transportation at Akkuyu NPP terminal in Turkey

Client
Akkuyu Nulcear Power plant
Period
March 2023
PROJECT
land transport of the STATOR at the Akkuyu PP terminal from the berth to the place of storage
CARGO
stator, weight 432 tonnes, 10,43х6x4,98 m

scope of work

Stage 1

Transshipment of cargo by crane LR-1700;

Stage 2

Land transportation by axles Sheurle - 12 double axles;

Stage 3

Off-loading at the terminal by gantry system SBL:

Stage 4

Engineering design, schemes of loading-unloading operations